PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Layout from the Administration Building to the New Building pic -5 (800x600).jpg Pouring concrete at Elev. 5,6 (3rd Floor) Facing South-West (800x600).jpg Starting saw cutting Rahway Ave by the Administration building (800x600).jpg Welding beams at Derrick -3 (3rd Floor) Facing North (800x600).jpg Continued compacting and backfilling Cafeteria Room 104 Facing North (800x600).jpg Continued excavation for the underground sanitary piping Facing East (800x600).jpg Continued saw cutting Rahway ave. under the bridge (800x600).jpg Platforms around Elev. 4-Stair -2 (3rd to 4th Floor) Facing South (800x600).jpg Sanitary piping at room 175A Facing East (800x600).jpg
Previous pageNext page Continued compacting and backfilling Cafeteria Room 104 Facing North (800x600)
Continued compacting and backfilling Cafeteria Room 104 Facing North (800x600)